Skip to product information
1 of 6

True HQ

True HQ 20M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

True HQ 20M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

Regular price £11.99 GBP
Regular price £20.00 GBP Sale price £11.99 GBP
Sale Sold out
Taxes included.
Colour Name
Size Name

True HQ 20M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated



Product Details

Size Name: 20M
Colour Name: Black
Brand: True HQ
MPN: True-HQ-HDMI20M
EAN: 5060706610137
UPC: Does not apply

  • Brand: True HQ
  • Connector type: HDMI
  • Cable type: HDMI
  • Compatible devices: CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. It is not compatible with Q, Pro, X 4K Blu Ray Players when the resolution set higher than 1080p. See more
  • Special feature: Long Length, Gold Plated Connectors, Triple Shielding, Designed in the UK
  • Batteries ‏ : ‎ 1 12V batteries required.
  • Package Dimensions ‏ : ‎ 24.7 x 23.6 x 6.5 cm; 1.11 kg
  • Date First Available ‏ : ‎ 23 Jun. 2019
  • Manufacturer ‏ : ‎ True HQ
  • Item model number ‏ : ‎ True-HQ-HDMI20M
  • Country of origin ‏ : ‎ China
  • Guaranteed software updates until ‏ : ‎ unknown
  • [20 METER HDMI CABLE] - 65FT High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless and crisp signal transmission. Our award winning HDMI cables are designed in the UK.
  • [QUALITY MATERIALS] - Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas.
  • [WIDE COMPATIBILITY] These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.
  • [HIGH SPECIFICATION] Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • [PREMIUM SERVICE] - Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service.

View full details